“At ROP of 26.6 hours, for 14.5hours with no deviation occurred within the borehole. It was reported that the PDC was very Top Drive friendly, due to the low vibration feedback via the drill pipe and overall smooth drilling. The PDC No damage was sited upon retrieval of the PDC bit. The client was satisfied overall with the performance and durability of the PDC. “
Energy Exploration client, East of Edson, Alberta, Canada